You are here
Upstream News
Global coverage of exploration and production, field development, shale, fracking and other upstream sector developments
24th March 2020 The scope of the Chevron agreement includes the delivery of engineering, design and manufacturing of dynamic and static control umbilicals, dynamic and static power umbilicals, and service and installation...
|
|
18th March 2020 As part of the work-scope Unity will deliver surface wellhead and Xmas tree maintenance services offshore, covering around one hundred wells, as well as providing onshore equipment testing, repair,...
|
|
5th March 2020 Over the next three years, the existing frame agreement will see Tendeka deliver its sand screens and FloSure Autonomous Inflow Control Devices (AICDs) to Aker BP’s fields on the Norwegian...
|
|
5th March 2020 In 2018, the two companies and Cognite, a global AI software company enabling the full-scale digital transformation of heavy-asset industries, embarked upon a digital pilot effort for predictive maintenance...
|
|
4th March 2020 The project was the first time that geophysical, geotechnical, and seismic data has been gathered at the same time. This was achieved through simultaneous operations of Ocean Infinity’s state of the...
|
|
3rd March 2020 Maersk Drilling has been awarded a one-well contract for the semi-submersible rig Maersk Discoverer offshore Egypt. The contract has an estimated duration of 21 days and is expected to commence in March...
|
|
3rd March 2020 “Sigrun East is a win-win. Exploring near existing infrastructure we prove resources that can be profitably realized, while producing with low CO2 emissions,” says Equinor’s senior vice...
|
|
3rd March 2020 More than 250 senior level delegates, including 30%+ operator representatives, will be gathering to participate in OWI APAC 2020, which takes place on 2nd and 3rd June 2020, Kuala Lumpur, Malaysia. ...
|
|
28th February 2020 Ocean Infinity will simultaneously deploy their advanced AUVs in water depths of between 70m and 2150m over an area of approximately 3,100 square km. This approach of autonomous operations at scale is a...
|
|
27th February 2020 The scope of the project included the preliminary, front end engineering and design (Pre-FEED), FEED and now entails detailed design of Anchor, a wet tree development that will employ a semi-submersible...
|