You are here

Seaway Heavy Lifting installs four Gulf of Mexico topsides for Pemex

29th January 2015

Seaway Heavy Lifting has successfully installed four topsides and a jacket in the Gulf of Mexico

Seaway Heavy Lifting has successfully installed four topsides and a jacket in the Gulf of Mexico
Out of a string of jackets and topsides in the Bay of Campeche in the Gulf of Mexico, the last topside was installed on Wednesday 28th January at 07.15am local time.

Seaway Heavy Lifting’s crane vessel Oleg Strashnov successfully installed the last three topsides in one week for client Protexa/Pemex.

Out of a string of jackets and topsides in the Bay of Campeche in the Gulf of Mexico, the last topside was installed on Wednesday 28th January at 07.15am local time.

Peter de Bree, Seaway Heavy Lifting’s COO said: “I am very pleased with our swift and safe performance during these five installations in the Gulf of Mexico with perfect cooperation between Protexa (Permaducto), Pemex and Seaway Heavy Lifting. Our Oleg Strashnov crew performed extremely well.”

Arjan van der Laan, Seaway Heavy Lifting’s CFO said: “I am proud of the relationship with our Mexican partners and that has been further strengthened by our performance. We have proven our value during the second period that the Oleg Strashnov was in Mexico.”

Got a news tip? Email news@oilandgastechnology.net