You are here

Upstream News Archive

Browse the oil and gas technology news archive for Upstream News

Falck has 36 training centres across the world
22nd September 2015

Falck Safety Services (Falck), which has 36 training centres across the world, including four UK sites in Peterhead, Aberdeen, Montrose and Teesside, can now offer EPIT’s hazardous area explosion protection...
Trelleborg’s floatover technology
21st September 2015

This allowed the stalled project to quickly and safely commence installation, ending an eleven month delay. The project previously experienced an unsuccessful floatover operation in August 2013,...
21st September 2015

The new hose features a liner tube made of polyvinylidene fluoride (PVDF), which helps handle fluids with higher concentrations of acid and lowers permeability with methanol and other similar fluids....
21st September 2015

DNV GL will support the operator in assuring the project equipment transportation and installations are conducted to recognized guidelines, standards and internal requirements. Shah Deniz Stage 2, or Full...
High-pressure drilling riser system
21st September 2015

Owen Lewis, project engineer, Claxton, said, “Claxton was the only company to offer Premier Oil a fully-forged riser design option in the early tender stages of the project, and they recognised the value of...
Emerson Process Management’s Roxar SandLog wireless sand erosion monitoring solutions
20th September 2015

Stork has successfully installed Emerson Process Management’s Roxar SandLog wireless sand erosion monitoring solutions on a major North Sea operator’s installation.   The collaboration with Stork...
20th September 2015

Following an initial software donation in 2012, CGG has made a second larger donation to UTP, this time of both its Hampson-Russell and Jason reservoir characterization suites. As a sign of its...
20th September 2015

During a ceremony held yesterday in London, a panel of independent experts representing all areas of the world of Energy, led by the Secretary General of OPEC Abdalla El-Badri, assigned the award...
Erha North Phase 2 project
17th September 2015

The Erha North Phase 2 project is a deepwater subsea development located 60 miles offshore Nigeria in 3,300 feet of water and four miles north of the Erha field, which has been producing since 2006. The...
MV Svenja
17th September 2015

The installation of the platform was highly challenging. Its realization marks an essential milestone towards the completion of the infrastructure of the largest development region in the Cook Inlet....

Pages

Got a news tip? Email news@oilandgastechnology.net