You are here

Upstream News Archive

Browse the oil and gas technology news archive for Upstream News

24th September 2015

St. Petersburg has hosted a working meeting between Alexey Miller, Chairman of the Gazprom Management Committee and Rovnag Abdullayev, President of the State Oil Company of the Azerbaijan Republic (...
BHP Billiton Chief Executive Officer, Andrew Mackenzie
24th September 2015

BHP Billiton is one of the largest producers of steel making materials and the only company that produces oil, gas, coal and uranium as well as the copper used in renewable energy systems. The Company has...
Cortland Company's precision lifting solution
24th September 2015

This project required an extremely precise lift with millimetre level tolerances. The module needed to remain in a narrow position and at a specified tilt at all times. Cortland supplied a unique hybrid...
22nd September 2015

Subsea UK, in partnership with UKTI, and support by EIC, NOF Energy and Aberdeen & Grampian Chamber of Commerce, are leading the mission which will bring UK companies with experience in field...
The signing of the agreement
22nd September 2015

The purpose is to establish a design and delivery model that leverages Technip’s proven engineering expertise as well as SHI’s extensive experience in semi-submersible FPS construction. It also aims at...
Falck has 36 training centres across the world
22nd September 2015

Falck Safety Services (Falck), which has 36 training centres across the world, including four UK sites in Peterhead, Aberdeen, Montrose and Teesside, can now offer EPIT’s hazardous area explosion protection...
Trelleborg’s floatover technology
21st September 2015

This allowed the stalled project to quickly and safely commence installation, ending an eleven month delay. The project previously experienced an unsuccessful floatover operation in August 2013,...
21st September 2015

The new hose features a liner tube made of polyvinylidene fluoride (PVDF), which helps handle fluids with higher concentrations of acid and lowers permeability with methanol and other similar fluids....
21st September 2015

DNV GL will support the operator in assuring the project equipment transportation and installations are conducted to recognized guidelines, standards and internal requirements. Shah Deniz Stage 2, or Full...
High-pressure drilling riser system
21st September 2015

Owen Lewis, project engineer, Claxton, said, “Claxton was the only company to offer Premier Oil a fully-forged riser design option in the early tender stages of the project, and they recognised the value of...

Pages

Got a news tip? Email news@oilandgastechnology.net