You are here
Upstream News
Global coverage of exploration and production, field development, shale, fracking and other upstream sector developments
25th September 2019 The scope of work included in this contract is for engineering, procurement, fabrication and offshore pull-in operations.ALE will start the engineering phase of this project immediately with offshore...
|
|
24th September 2019 The agreement was signed by Rainer Seele, CEO of OMV Aktiengesellschaft, Marco Alverà, CEO of Snam S.p.A., as well as the Managing Directors of TAG GmbH, Daniele Gamba and Rudolf Starzer.The MoU lays out...
|
|
19th September 2019 The agreement makes France’s Total and Italy’s Eni the biggest players in the Mediterranean island’s energy search, holding exploration licenses for seven of the 13 blocks. Korea’s...
|
|
19th September 2019 SWIM.AI today announced general availability of a new enterprise software product, Swim DataFabric. DataFabric software lets businesses interconnect all data-generating assets and provides...
|
|
18th September 2019 Simulator training to prepare crews for the specific drilling conditions at Blackrock off Shetland has proved so successful it is being rolled out across other projects.Siccar Point Energy commissioned the...
|
|
18th September 2019 Recoverable resources are estimated at 8–14 million standard cubic metres of oil equivalent, corresponding to 50–88 million barrels of oil equivalent (boe).“This is good news. The Ørn...
|
|
18th September 2019 This new framework will be an industry first D&D ecosystem between class, shipyard and ship service company. Launched at a ceremony during Gastech, the new framework enables HHI, HGS and ABS to...
|
|
17th September 2019 The project incorporates two Polarcus high-end streamer vessels plus two source vessels. As previously announced, the duration of the project is approximately four months; a total of eight vessel months....
|
|
17th September 2019 Machine learning continues to make the headlines at industry events this year with dedicated workshops and technical sessions. While machine learning offers opportunities to potentially revolutionise...
|
|
17th September 2019 The Joe-1 exploration well was drilled by the Stena Forth drillship to a Total Depth of 2,175 metres in water depth of 780 metres. Evaluation of logging and sampling data has confirmed that Joe-1 has...
|
Pages
Got a news tip? Email news@oilandgastechnology.net