You are here

Upstream News Archive

Browse the oil and gas technology news archive for Upstream News

26th January 2018

The GEBCO-NF Alumni Team has completed the Technology Readiness Tests of the Shell Ocean Discovery XPRIZE using a combined Unmanned Surface Vessel (USV) and Autonomous Underwater Vehicle (AUV) system....
25th January 2018

Wilson Sons Ultratug Offshore is a joint venture between Wilson Sons and Ultramar. Wilson Sons Ultratug Offshore has one of the largest and most modern OSV fleets in Brazil.Under the contract, liquid...
25th January 2018

The Centre’s Call for Ideas programme seeks to identify, fund and support innovative ideas and concepts from inside and outside the oil and gas industry. The Calls focus on a range of themes that have...
25th January 2018

Wellbore 35/9-14 will be drilled from the Songa Enabler drilling facility, at position 61⁰25' 19.8727’’ North, 03⁰49’ 41.92’’ East after completing the drilling...
23rd January 2018

The company will deliver a subsea production system consisting of two manifolds and nine trees for the Troll development in the North Sea. The system for Askeladd in the Barents Sea will be comprised of two...
23rd January 2018

Chris Kuykendall and Linda Villa have joined Umbilicals International as Sales Manager and Procurement Manager, bringing more than 30 years’ combined subsea experience to the firm. Bob Conners,...
22nd January 2018

The vessel is designed by Robert Allan Ltd and DAMEN Hardinxveld. The naming ceremony took place in Sharjah, UAE, where it was built at the Albwardy Damen yard.The RT Raven will provide offshore services,...
22nd January 2018

Part of the program is to develop, fabricate and test a skid mounted Crystallizer Vessel for qualification, confirming the functionality and proving the concept of melting CO2 solids and producing...
19th January 2018

Trelleborg was asked to design and supply fenders for connection to the modules’ structure pillars, each coated with passive fire protection, to protect it from potential incidental damage caused by...
18th January 2018

Exploration activities, including acquisition of seismic data and analysis, are expected to commence later in 2018. The Deepwater Cape Three Points block, located 57 miles (92 kilometers) off the coast of...

Pages

Got a news tip? Email news@oilandgastechnology.net